DUALIFE 104 Inch Linen Taupe Blackout Curtains for Bedroom,Pinch Pleated Custom Length Rustic Track System Full Black Out Thermal Insulated Back Tab Drapes for Living Room 2 Panels W40xL104

DUALIFE 104 Inch Linen Taupe Blackout Curtains for Bedroom,Pinch Pleated Custom Length Rustic Track System Full Black Out Thermal Insulated Back Tab Drapes for Living Room 2 Panels W40xL104

$145.18
Skip to product information
DUALIFE 104 Inch Linen Taupe Blackout Curtains for Bedroom,Pinch Pleated Custom Length Rustic Track System Full Black Out Thermal Insulated Back Tab Drapes for Living Room 2 Panels W40xL104

DUALIFE 104 Inch Linen Taupe Blackout Curtains for Bedroom,Pinch Pleated Custom Length Rustic Track System Full Black Out Thermal Insulated Back Tab Drapes for Living Room 2 Panels W40xL104

$145.18
Shipping calculated at checkout.

About This

  • Basic Information: Each package contains 2 panel of pinch pleated full blackout curtains with 12 hooks. Each panel measuring 40 inches in width and 104 inches in length with 6 pinch pleats and 7 tabs. The 3.3-inch back tab design is designed to fit most standard rods.
  • Linen Blend Curtains: Crafted from rich linen blend fabric with 100% blackout coating. Soft touch feeling on these draperies often have a more elegant and formal appearance, contributing to the overall aesthetics of a room. Add a touch of luxury and formality to the room with DUALIFE linen blend curtains.
  • Pleat Custom Design: The intricate craftsmanship involved in creating pinch pleated curtains, with evenly spaced pleats, contributes to their appeal. The pinch pleats create structured folds, giving the curtains a more tailored appearance and creating a more polished and finished look for window treatments. Our curtains have 2 hanging options to meet your different needs: back tabs, ring hooks(rings are not included).
  • Energy Smart: The pleats also provide an added layer of insulation, helping to regulate room temperature more efficiently by reducing heat transfer through windows, which can be advantageous for energy efficiency
  • Easy Care: Machine wash cold. Gentle cycle. Do not bleach. Use a vacuum cleaner to clean the surface of the curtains to prevent the accumulation of dust. Steam iron from back when needed. Iron at low temperature. Do not iron on the inner black film of the curtains, to avoid unnecessary misunderstanding.

Overview

  • Brand : DUALIFE
  • Color : Taupe
  • Material : 80% Polyester,20% Linen
  • Product Dimensions : 104"L x 40"W
  • Opacity : Blackout Inches

CARE & MAINTENANCE

To maintain the beauty and integrity of your purchase, we recommend treating it with care. Simple maintenance practices, such as gentle washing and proper storage, can effectively preserve the longevity of your favorites. We encourage you to refer to the care instructions included with each item, designed to help you keep your purchase in top condition.

SHIPPING & RETURNS

We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible. Need to return something? Just let us know.

Discover Your Style

Every home has its own character, and every customer has their own sense of style.

At DisplayHaus, we offer home décor designed to complement a variety of interiors—from clean and modern spaces to cozy, classic, contemporary, and eclectic homes. Our collection is created with the idea that great design is often found in the details.

You may also like